Skip to main content
CoolingSim · v0.16 now open to engineering teams
Built by Terrabyte engineers, for large-scale campuses

Eighty-five years
of weather, in one run.

Build 100% sustainable, exascale-capable data-centre campuses with science-grade software support. Choose where, when and how to cool them.

Dry-bulb · Lisbon · 1940 → 2025
+1.2°C drift in mean dry-bulb since 1940

A 25-year design life starting today must hold for the climate of 2050 — not 2024. CoolingSim is built around that reality.

DC-COOLING.LIGHTFOSSIL.COMPOWER IS KNOWLEDGE — EXASCALE SOLUTIONS FOR THE DATA CENTRES OF THE FUTURE.v0.16 · May 2026
85years
ERA5 reanalysis at every candidate site
1940 → 2025
5tech.
Cooling families evaluated per run
Wet · Adiabatic · Dry · DLC · Immersion
425runs
Annual hourly scenarios per technology
Hourly granularity, 8 760 × 85
100%
Renewable target on every campus
24/7 carbon-free, contracted
The premise

A data-centre will outlive every climate model it was built against.

Hyperscalers still pick cooling technology from a spreadsheet of typical-meteorological-year averages. We don’t. Every candidate site, every technology, every hour for the last eighty-five years — that’s 36 million-plus simulated hours per brief before a single chiller is specified.

The output is not a recommendation. It’s an evidence file — design PUE, P99 PUE, WUE, capex, lifetime opex, ISO/IEC 30134-2 worksheet — that an EPC can hand to a permitting authority on day one.

The platform · CoolingSim

One brief in.
425 cooling scenarios out.

Drop coordinates, IT load and a reliability target. CoolingSim returns the full 5-technology × 85-year matrix, ranks by PUE / WUE / opex, and writes the engineering report straight into your handoff package.

  • Hourly ERA5
    Reanalysis at any lat/lon · 1940 → 2025
  • 5 technologies
    Wet, adiabatic, dry, direct liquid, single-phase immersion
  • Auditable maths
    Every PUE value traces back to its weather hour
  • DOCX export
    Permit-ready engineering report, ISO/IEC 30134-2
Synthetic preview of the CoolingSim simulation interface — Lisbon Phase 1 brief showing PUE distribution histogram across 85 years of synthetic ERA5 data.
Workflow

Brief on Monday. Permit-ready report on Friday.

01

Brief

Coordinates, IT load, redundancy posture. Optional: paste a customer RFP and let the AI Architect draft the JSON.

JSON · YAML · plain English
02

Simulate

Five cooling families × 85 years of ERA5 weather × hourly granularity. Roughly 36 M simulated hours per technology per brief.

~6 min on a single worker
03

Report

Structured DOCX with sign-off blocks, KPI matrix, climate baseline and the full sensitivity table. Auditable, exportable, reproducible.

DOCX · PDF · IFC · JSON
Standards in the box

Reports cite their sources. Always.

ISO / IEC
30134-2
PUE
ISO / IEC
30134-9
WUE
ASHRAE
TC 9.9
Thermal envelopes
IEEE
519
Harmonics
Uptime
Tier III·IV
Topology
Position
To get away from the typical greens that are nowadays associated with greenwashing, we treat energy and data as the same substance — light projected into the world. Our accent is the orange of an Earth rising.
COMPANY PRINCIPLE
Open beta

Run your campus against eighty-five years of weather. Today.